Product

MORE+

Latest news

MORE+

Hot Keywords

Contact Us

  • Guangxi Senge Automation Technology Co., Ltd
  • Website:http://www.gxsenge.net/
  • Telephone:0771-3925018
  • Email:gxsenge163.com
  • Address:No. 1005, Building 7, Gonggu, Anji Wall Street, No. 189 Development Avenue, Xixiangtang District, Nanning City
Your current location:首页 > News > Company dynamics

Operation method of pull-out switchgear

Release time:2024-06-26 17:10:00 Source:http://wap.gxsenge.net Classification:Company dynamics Views

Today, the self-control system - Senge Technology will teach you the operation method of pull-out switchgear:


1、 Before pushing in the switch, confirm that the switch cabinet operation handle is in the correct position. The value of the switch handle is in the "disconnect" position, the drawer position handle is in the "↓↑ (withdrawal position)", and the circuit breaker operation handle is in the "O (disconnect position)" position.


2、 Grasp the two handles below the switchgear with both hands and slowly push the switchgear in.


3、 When there is still about 4-5cm left until the switchgear is fully pushed in, use both hands to quickly push the switchgear in.


4、 Check if the switchgear is fully pushed in: By checking if the switchgear is tightly matched with the cabinet body, it can be determined whether the switchgear is fully pushed in.


(The article is sourced from the internet. If there is any infringement, please contact us to delete it.)


Related tags:

Previous article:Maintenance Regulations for Distribution Boxes

Next article:What is the function of the power distribution cabinet

Recent browsing
Related products
News